Overview

client Hermès Vietnam
scope Hoarding Production & Installation
location Vietnam
timeline
Hermès – Hoarding
01

The Challenge

  • Uneven Existing Surface — The original surface was not suitable for direct hoarding installation and required additional treatment before execution.
  • Strict Color Accuracy — Printed colors needed to be carefully tested and matched to Hermès’ approved brand guidelines.
  • Luxury-Level Finishing — Installation required a clean, smooth, and precise final appearance suitable for a luxury retail environment.
02

Our Approach

  • Surface Preparation — Treated and prepared the existing uneven surface to create a suitable base for hoarding installation.
  • Print & Color Testing — Conducted print tests and color checks before final production to achieve the required brand colors.
  • Controlled Production — Monitored printing and finishing to maintain consistency across the complete hoarding surface.
  • Precise Installation — Carefully installed and aligned each section to achieve a smooth and consistent final finish.
03

Execution Detail

Golden Point supported Hermès Vietnam in the production and installation of hoarding, where execution quality and color accuracy were critical to maintaining the brand’s visual standards. Beyond printing and installation, the project required careful site preparation to overcome the existing uneven surface and create a clean, consistent finish for the final hoarding.